| UPDATE # | SUBJECT | REVISION DATE | REVISION # |
| P101FSR | VT GREEN SHEET | JUL 14, 2004 | 01 |
| P102 | ADVANTAGES OF USING MENDE BOARD CROSSBANDS | N/A |
|
| P103FSR | PREMIUM GRADE VENEERS RE: RUNNING MATCH | JUN 25, 2004 | 01 |
| P104F | WOOD GLAZING STOPS, SURFACE APPLIED MOULDINGS, & LOUVERS | NOV 22, 2004 | 04 |
| P105FSR | VT POLICY ON THE HANDLING OF CLAIMS | FEB 26, 1996 | 00 |
| P106F | OPAQUE FINISHED DOORS - MEDIUM DENSITY OVERLAY (MDO) vs. PAINT GRADE BIRCH VENEER | JUN 13, 2004 | 01 |
| P107FSR | READING VT DOOR LABELS | MAY 16, 2003 | 03 |
| P108F | FACTORY FINISHING OF STC -45 DOORS | NOV 11, 1996 | 00 |
| P109FSR | JOBSITE RECOMMENDATIONS FOR MATCHING VT WATER-BASED STAINS | DEC 16, 1996 | 00 |
| P110 | DURACLAD™ DOOR REPAIR | N/A | |
| P111F | 45- & 60-MINUTE DUTCH DOORS | JUN 03, 1998 | 02 |
| P112F | 90-MINUTE DOUBLE EGRESS PAIRS | APR 01, 2004 | 03 |
| P113F | PLANT ON MOULDING RESTRICTIONS FOR 20-, 45-, 60-, AND 90-MINUTE DOORS | JUL 15, 1998 | 01 |
| P114F | 20-MINUTE SMOKE BARRIER LABELS - POSITIVE OR NEGATIVE PRESSURE | SEP 15, 2003 | 02 |
| P115FSR | CONCEALED VERTICAL ROD EXIT DEVICES WITH THE USE OF METAL CHANNELS | OCT 29, 2009 | 03 |
| P116F | STC DOOR HARDWARE & WARRANTY | APR 04, 1997 | 00 |
| P117F | SEALING OF TOP & BOTTOM RAILS | APR 11, 1997 | 00 |
| P118F | 20-MINUTE THROUGH 90-MINUTE FIRE DOORS WITH PROTECTION PLATES UP TO 48" | APR 02, 2004 | 01 |
| P119F | NOISE ISOLATION CLASS (NIC) COMPARISONS FOR STC DOORS | JUL 03, 1997 | 00 |
| P120F | 1-3/8" AND 1-3/4" SOLID CORE DOORS IN LIEU OF HOLLOW CORE DOORS | JUL 08, 1997 | 00 |
| P121FSR | STRUCTURAL COMPOSITE LUMBER (SCL) IS PREFERRED CORE MATERIAL | JUL 15, 1997 | 00 |
| P122F | SPECIAL THICKNESS DOORS WITH STAVE LUMBER CORES | OCT 20, 1997 | 00 |
| P123F | MDO DOOR CONSTRUCTION | AUG 17, 1999 | 02 |
| P124 | DOOR CONSTRUCTION CHANGES IN KARONA STILE & RAIL DOORS SOLD BY VT INDUSTRIES, INC. | N/A |
|
| P125F | DISCONTINUE HARDBOARD-FACED DOORS | SEP 01, 1998 | 00 |
| P126 | MDO- PRIMED AND UNPRIMED | N/A |
|
| P127F | VENEER-ART® | FEB 12, 1999 | 00 |
| P128F | HARDBOARD IN LIEU OF 1/16" HARDWOOD CROSSBAND IN HPDL & WOOD VENEER DOORS | APR 01, 2004 | 02 |
| P129F | THE VT "EDGE" ON HPDL DOORS WITH -1, -2, -4 STILE OPTIONS | JUN 30, 2003 | 02 |
| P130FSR | BHMA WEBSITE | MAY 24, 1999 | 00 |
| P131F | WDMA - ANSI CERTIFICATION | MAY 27, 1999 | 00 |
| P132F | 20-MINUTE POSITIVE PRESSURE APPROVALS | MAR 31, 2000 | 00 |
| P133F | HARDWARE RESTRICTIONS FOR 1-3/8" THICK DOORS | MAY 31, 2000 | 00 |
| P134F | EPT DEVICE APPROVAL ON 20-MINUTE THROUGH 90-MINUTE FIRE DOORS | APR 03, 2002 | 00 |
| P135F | RACEWAY LOCATION APPROVAL ON 20-MINUTE THROUGH 90-MINUTE POSITIVE PRESSURE FIRE DOORS ABOVE THE 40" NEUTRAL PLANE | APR 04, 2002 | 00 |
| P136F | CONCEALED VERTICAL ROD EXIT DEVICE APPROVAL FOR 45-, 60-, NAD 90-MINUTE POSITIVE PRESSURE DOORS | JAN 15, 2004 | 01 |
| P137F | REDUCING THE MINIMUM DISTANCE BETWEEN LITE AND LOCK CUTOUTS ON 20-MINUTE FIRE DOORS | JAN 05, 2004 | 02 |
| P138F | WOODSTOP APPROVALS IN 20-MINUTE POSITIVE PRESSURE FIRE DOORS | APR 18, 2002 | 00 |
| P139F | TIMELY FRAME APPROVALS | APR 22, 2002 | 00 |
| P140F | UNBALANCED DOOR CONSTRUCTION REGARDING AUTOMATIC FLUSHBOLT PREPS | MAY 15, 2002 | 00 |
| P141F | THE VT "EDGE" | MAY 31, 2003 | 02 |
| P142F | DETERMINING TOP OR BOTTOM RAIL THICKNESS | FEB 23, 2004 | 01 |
| P143F | HPDL FACED WOOD DOORS vs. LPDL FACED DOORS | AUG 9, 2004 | 02 |
| P144F | 960 SERIES AUTOMATIC FLUSH BOLT | SEP 12, 2003 | 00 |
| P145F | EDGE IMPACT TEST VT.TM-1 | OCT 17, 2003 | 00 |
| P146F | TEMPERATURE RISE RATINGS | OCT 17, 2003 | 00 |
| P147F | 45-MINUTE SCL CORE DOORS | JUN 01, 2005 | 02 |